The design is a forerunner of the head office in the centre of Enschede. A challenging and colourful design was required that would accommodate a large number of people. Combining several features resulted in a skybox that exudes a real club atmosphere. There is a great contrast between this skybox and most of the other skyboxes in the stadium. This conversion took one month. The project was completed in October 2014.